Job site guide

Which construction bin size do you need?

Construction and renovation debris is heavy, so the right bin depends on both volume and weight. Here's how to match the bin to your job.

What kind of job is it?

Tap one and we'll suggest a size.

10 yard

Heavy material

Concrete, brick, asphalt or soil

Driveway and patio removal, landscaping, small demolition

14 yard

Small renos

One room of tear-out

Bathroom renos, flooring, drywall and deck removal

20 yard

Most popular

Mid-size renovation debris

Roofing on most homes, kitchen renos, basement finishing

30 yard

Large projects

Whole-floor or multi-room tear-out

Additions, full gut renovations, large roofs

40 yard

Major construction

Bulky, lighter debris in big volumes

New builds, full demolition and commercial sites

Sizes are approximate and vary by provider. Your quotes will confirm the details.

Tips before you book

  • Heavy debris like concrete, brick or shingles hits the weight limit before the bin is full. Ask about tonnage included.
  • Keep clean fill (concrete, brick, soil) separate when you can. Some providers charge less for it.
  • Roofing: plan on about one 20 yard bin for an average home. Ask your roofer for the number of squares.
  • Leave about 18 m of clear space for the truck, and protect your driveway with boards if needed.
  • Check whether your city needs a permit to put the bin on the street.
  • Long job? Ask about swap-outs so a full bin is replaced with an empty one.

Still not sure?

Send a request with your best guess and add notes. Local providers will confirm the right size with their price.

Get construction bin quotes