Job site guide
Which construction bin size do you need?
Construction and renovation debris is heavy, so the right bin depends on both volume and weight. Here's how to match the bin to your job.
What kind of job is it?
Tap one and we'll suggest a size.
10 yard
Heavy materialConcrete, brick, asphalt or soil
Driveway and patio removal, landscaping, small demolition
14 yard
Small renosOne room of tear-out
Bathroom renos, flooring, drywall and deck removal
20 yard
Most popularMid-size renovation debris
Roofing on most homes, kitchen renos, basement finishing
30 yard
Large projectsWhole-floor or multi-room tear-out
Additions, full gut renovations, large roofs
40 yard
Major constructionBulky, lighter debris in big volumes
New builds, full demolition and commercial sites
Sizes are approximate and vary by provider. Your quotes will confirm the details.
Tips before you book
- Heavy debris like concrete, brick or shingles hits the weight limit before the bin is full. Ask about tonnage included.
- Keep clean fill (concrete, brick, soil) separate when you can. Some providers charge less for it.
- Roofing: plan on about one 20 yard bin for an average home. Ask your roofer for the number of squares.
- Leave about 18 m of clear space for the truck, and protect your driveway with boards if needed.
- Check whether your city needs a permit to put the bin on the street.
- Long job? Ask about swap-outs so a full bin is replaced with an empty one.
Still not sure?
Send a request with your best guess and add notes. Local providers will confirm the right size with their price.
